Skip to Main Content
Table 1.

Osmotic stress accelerates commitment to mitosis

Time post-sorbitol (minutes) Cell length at division* (μm) Peak bin (μm)
0   12.1±0.8   11.5-11.75  
150   15.4±4.6   11.25-11.5  
180   12.5±3.7   10.25-10.5  
Time post-sorbitol (minutes) Cell length at division* (μm) Peak bin (μm)
0   12.1±0.8   11.5-11.75  
150   15.4±4.6   11.25-11.5  
180   12.5±3.7   10.25-10.5  
*

Cell length at division was measured for a minimum of 100 cells at each time point

Peak bins of the plots shown in Fig. 3 

Close Modal

or Create an Account

Close Modal
Close Modal